Define the start and finish
The commercial order is accepted, but release follows a readiness review appropriate to the operation. Requirements depend on the product and production environment; use approved technical and quality controls.
Workflow record and acceptance checklist
| Record | Information required |
|---|---|
| Order definition | Current specification, quantities, required dates, and approved revisions |
| Routing | Required operations, sequence, setup needs, and responsible work centers |
| Material readiness | Availability, purchasing status, and approved alternatives |
| Capacity review | Constraint work center, expected effort, and planned release window |
| Release decision | Accepted, blocked, or conditionally released with a responsible approver |
Run the workflow
- Planning verifies that the order information agrees with the current approved specification.
- Production and purchasing review the constraints affecting the release window.
- The authorized owner releases the job and records unresolved conditions through the approved exception process.
Worked example
Illustrative example: an order has sufficient assembly capacity but a required upstream operation is fully loaded. Planning checks that work center before confirming a ship commitment and sequences the order around the actual constraint.
Handle the exception explicitly
A missing revision or unresolved quality requirement should reach the appropriate technical owner. Avoid informal substitutions or schedule promises that bypass required approval.
Measures to review
Track jobs released with missing prerequisites, schedule changes by cause, and waiting time at the constrained work center. Review whether better release discipline reduces expediting.
Pilot before standardizing
Test this workflow on a small set of real cases with the people who send and receive the work. Keep a record of missing information and decisions that were unclear. Assign one owner to revise the operating instructions, then review the next completed case against the revised version.