Define the start and finish
Start a change record when quantity, specification, date, or routing may differ from the accepted order. Use the operation’s approved technical and quality process for formal revision control.
Workflow record and acceptance checklist
| Record | Information required |
|---|---|
| Requested change | Order reference, current version, proposed difference, and requestor |
| Work status | Purchased material, released work, completed operations, and affected inventory |
| Impact review | Cost, timing, technical approval, quality, and customer effects |
| Approval record | Authorized commercial and technical decisions as applicable |
| Communication | Updated records and acknowledgement by affected roles |
Run the workflow
- Customer-facing staff record the request without promising feasibility.
- Planning and responsible specialists identify affected work and required decisions.
- After approval, the owner updates the controlled records and verifies that affected teams received the current instructions.
Worked example
Illustrative example: a buyer changes quantity after a job is released. Planning checks material availability and the constrained operation, while finance and commercial owners review the change in terms. The accepted decision is communicated to production rather than remaining in a seller’s email.
Handle the exception explicitly
If old and new instructions conflict, escalate to the designated owner before proceeding with affected work. Keep the traceable decision in the approved system rather than relying on a chat message.
Measures to review
Review changes discovered after release, schedule disruptions caused by late communication, and obsolete instructions found in active work. Investigate the handoff that failed rather than only the final error.
Pilot before standardizing
Test this workflow on a small set of real cases with the people who send and receive the work. Keep a record of missing information and decisions that were unclear. Assign one owner to revise the operating instructions, then review the next completed case against the revised version.